
Garis Panduan CDM Edisi 2026
CDM 2026 · 26 of 52
Part IV: Determining Who Controls Site Requirements
Guidance for mapping actual control, coordinating responsibility and verifying Part IV requirements at construction sites.
Ir. Ts. Dr. Hj. Mohd Fairuz Ab Rahman (PMP)Ir. Ts. Dr. Mohamad Syamir bin Senin.7 min read